All entries for Tuesday 29 January 2008

January 29, 2008

Building the Airplane

My hands are very sore now, was trying to implement the six sigma DMAIC process on improve the delivery on time. We were able to shift the process mean to the target, but not able to control the variation. Actually it went worse!

Our team was trying to improve the logistics aspects of the operation. I was suppose to be the distributor for all the materials. The production line was one short of an operator, so I join the production and poor Alice took the role. Drove her crazy.

Suddenly realise one thing, why didn't arrange the production line in U shape? must be lots of waste, when she was walking from one end of the line to the other end of the line. Why didn't I think of that?


January 2008

Mo Tu We Th Fr Sa Su
Dec |  Today  | Feb
   1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31         

Search this blog

Galleries

Most recent comments

  • Just as much as in a recent channel modelling project we have in my Org led by Sales. We are still n… by on this entry
  • Turns out TATA's management strategy for Mergers and Acquisitions(M&A) is based on Knowledge Managem… by on this entry
  • thank you luo. and please dont say sorry¡­ it was really really a happy experience. this blog is not… by on this entry
  • A guest speaker from TATA gave a presentation in one of my TM module's sessions. It was quite intrig… by on this entry
  • Reading this entry and Paul's comment made me think about all the times back at school where I used … by on this entry

Blog archive

Loading…
Not signed in
Sign in

Powered by BlogBuilder
© MMXXI