Snatching Victory from the Jaws of Defeat part 2

Picture the scene. The critical equipment you have been waiting to have ready is online and practical work is going well. You are on track to have results ready for the conference you are going to at the end of the month.

You now have a new gauge on the furnace so you aren't having to borrow one. It's in Torr not mbar but that isn't a worry since 1 torr = 1.333 mbar.

A new set of samples are loaded into the samples. First pumpdown goes without a hitch. Time to do the argon purge so follow the Standard Operating Procedure (SOP). All valves are checked, valve on vacuum pump is closed and Ar gas cylinder is carefully opened to allow gas to pressurize vacuum chamber to 1 bar Ar. Cylinder valve, flowmeter valve and lower chamber valve is opened in order.

Pressure starts to increase from its baseline near 2 x 10-1 torr baseline but starts to slacken off near 43.3 torr, despite the positive pressure at the Ar cylinder and flowmeter.

Two operators in the room, one manning the Ar tank adjacent to the flow meter and the other manning the chamber valve. Both can check the valve.

Chamber valve is opened further, pressure increases to 82 torr and levels. Valves still open but pressure just fluctuates - still short of the 760 torr target pressure-


POP!

Top of furnace arcs 10 cm from the neck of the tube and embeds itself in the lab floor. Operators act to shut off cylinder, turn off vacuum pump and shut all the valves.

Now it is time to take photos and file an incident report. Here is the resulting damage:

Damage to worktube post over-pressure incident


Here is the top vacuum assembly post incident:

Top vacuum furnace assemblage

In terms of damage, the top assemblage with the exception of the vacuum gauge is still intact. The worktube has kept its integrity with the exception of a 30 mm spall damage at the top of the tube. This will need to be removed before a seal can be established.

So while the incident report is filed, the next questions are how did it happen?

Identification of the fault showed that the over-pressure from the misreading of the gauge was 1.1 bar, which was not sufficient to trigger the failsafe valve set at 1.2 bar.

The tube was overpressured as a result of a hitherto unknown nonlinearity in the behaviour of Ar at sub-atmosphere. For Pirani-type guages that rely on convection, diatomic and monatomic gasses behave differently at low pressures. The net result is that while N2 and O2 behave mostly linearly with respect to measured pressure, monatomic gasses do not:

Gas behaviour at different pressures

As can be seen, it is very easy to overpressure a furnace with Ar using a Pirani gauge, which relies on convection. Gauges that rely on absolute pressure via a plate are more reliable for this type of operation.

The actual fault was a result of a sudden loss of friction between the O-ring and worktube when at overpressure, resulting in the loss of upper vacuum assemblage while overpressure. This resulted from distortion of the o-ring at elevated temperature.

From this evidence it is apparent that the current assemblage is not fit for purpose when at high temperature, despite the highest temperature recorded at the gasket. This has lead to the following faults that need to be remedied before the furnace can be recommisioned.

  • A thermal shield is required for the top part of the furnace. This will need to sit in the neck of the furnace and sit on the top of the furnace so it can stay in place during a furnace cycle. Can be fabricated from an existing thermal shield with an additional thermal plug at the top. This will significantly cut the thermal load at Tmax when radiation is the main contributor.
  • Larger bore tubing for the vacuum pump exhaust to prevent pressure build up on turning pump on.
  • For general use, use N2 line for purging since this will prevent the risk of overpressure. This will require an additional 6-7 m of PVC tubing to connect the spare N2 line to the gas inlet.
  • A regulator can be added to the Ar cylinder to prevent gas overpressure and to limit the outlet pressure to 1 bar.
  • A new pressure gauge that does not rely on convection and will not go nonlinear at sub-atmosphere pressure.
  • Repair of worktube to enable fitting of o-rings.

Additional safety features to be added are as follows:

  • Bolting the top assemblage onto the top of the furnace cage to prevent loss of top vacuum system and enable triggering of safety valve.
  • Use of fans at top of furnace to keep top cool and increase the longevity of the seals.
  • Amending SOP to better reflect the operation of the furnace.

Once all these items are addressed the furnace can be recommisioned. Once thing is for certain, no practical work is so important that operator safety can be compromised.


May 23, 2022

Snatching Victory from the Jaws of Defeat part 1

There has not been that many updates for a while but that is hardly surprising when it is considered that the group has been consolidating data obtained from the DCF while working on sintering trials in time for the Plansee meeting for the end of May.

May has been a pivotal month for the cWC-RSB project. This month marks the first ever Generation 2 RSB sintered at Warwick, fulfilling the critical aim to showcase this work at Plansee 2022 - a highly strategic meeting for experts in W metal and cutting tools where the cWC-RSB project will meet its widest audience. Until the vacuum furnace got blown up that is - more on that later.

If there is one universal constant of experimental work is that failure is always an option. Whether it be the underpinning hypotheses, poor or inappropriate experimental design, personality clashes, equipment failure or too relevant now, war breaking out - whenever there is a long stretch of experimental work, there will be failure.

The key progress indicators are what the nature of the failures are and how they are responded to. This particular failure was equipment related and will be discussed in more detail in the next entry.

Prior to this, experimental work on RSB sintering trials had been progressing well. Recent results indicate that RSBs will expand to almost twice their volume prior to consolidation. Other results show that RSBs do not start to consolidate much before 1350oC. The 1300oC sintering trial is seen below:

RSB55 sintered at 1300C

RSB55 (target composition 30at% W, 30at% B, 30at% Fe, 7.5at% C and 2.5at% Cr) sintered at 3 hours at 1300oC.

Raising the sintering temperature to 1400oC for 2 hours had a dramatic change in the sintered RSB in that the sintered samples was observed to densify and shrink as for a generation 1 (Gen1) RSB55:

RSB55 sintered at 1400C for 2 hours

The Gen2 1400oC RSB55 is still not as dense as the original 1450oC vacuum sintered/SinterHIPPed RSB55 (86% vs 98% assuming similar phase presence) but is dense enough to be polished and considered a true Gen2 RSB. All that needs to be done is more trials at higher temperatures up to 1450oC.

That is until the vacuum furnace blew up, damaging the worktube and requiring the filing of a Near Miss Incident Report.

The basic cause of the failure was overpressuring the tube during the purge cycle - samples are vacuum sintered but an Ar purge is administered prior to pumpdown to remove trace O2 and water vapour from the tube and attain a decent vacuum - < 7 x 10-2 mbar (7 Pa) is a target for this vacuum furnace. However, the causes of the failure were not as simple as at first sight.

The next entry will look at methods used to identify the failure, the causes of said failure and how this inident can be used to better improve operator safety and furnace reliability in future.


October 2024

Mo Tu We Th Fr Sa Su
Sep |  Today  |
   1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31         

Search this blog

Galleries

Blog archive

Loading…
RSS2.0 Atom
Not signed in
Sign in

Powered by BlogBuilder
© MMXXIV